Ready.

Page 56. This page is in the page-by-page raw-dumps section.



Fig.3.5 Time-lines

The figure is a time chart and says that when two processes are running concurrently, they may overlap in time. The figure is trivial. Yet, the consequences, as discussed on other pages, breaks the naive verification algorithm which copycat82 assumes would work. As a result, the intention, obviously, was not to tell the situation, before doing something about it. Only telling it, filling a page, and more. Then, completely ignores its side-effects.





Further Reading

(page-by-page raw-dumps section) . . . . . previous . . . . . next




Forum: . . (Fair Menu . . . . . Fault Report? . . . . . Remedy for your case . . . . . Noticed Plagiarism?)

Referring#: 0.0.1
Last-Revised (text) on June 10, 2004 . . . that was http://www.geocities.com/ferzenr/decalun.pg056.htm
Links-update: June 18, 2004
mirror to mid80.net, on June 18, 2009
Written by: Ahmed Ferzan/Ferzen R Midyat-Zila (or, Earth)
Copyright (c) 2004, 2009 Ferzan Midyat. All rights reserved.
mirror